In 2020, India had about 375 MW of data-centre power capacity. By August 2026, it had about 1.57 GW, more than four times as much, and India's Central Electricity Authority says data-centre power demand could reach 17 GW by 2031-32. Google has laid the foundation of a 1 GW AI data-centre hub at Visakhapatnam, and Meta has signed up for a 168 MW data centre that Reliance is building at Jamnagar.
Every one of those buildings needs a substation, transformers, cables, backup gensets, batteries, cooling and fibre before a single server is switched on. Many of these come from listed Indian companies, and some of them now sell the same equipment to data centres in the US. This page lists the companies we have studied in depth that have a real data-centre business, with each one's latest data-centre figure, and then other listed names in the chain. Each linked row leads to our full research on that company.
Figures as of 13 November 2026. This page is research, not a recommendation to buy or sell any stock.
Data Centre Stocks in India at a Glance
| Company | Where it sits | What it supplies to data centres | Latest data-centre figure (date) |
|---|---|---|---|
| Techno Electric | Substations and owner-operator | Builds substations, and builds and runs its own data centres in Chennai, Noida, Kolkata and at edge sites with RailTel | Chennai campus redesigned from 24 MW to 35-40 MW of IT load in the same buildings (Aug 2026); ₹628 Cr of data-centre capex so far |
| APAR Industries | Power cables | Medium-voltage EPR cables for US data centres, and cables for Indian ones | About ₹1,000 Cr of data-centre cable orders (Google in the US, Amazon in India) in a ₹3,012 Cr cable order book (Sep 2026) |
| Kirloskar Oil Engines | Backup power | Large diesel gensets, including the twin-engine Optiprime | First hyperscale data-centre order, for about 192 MW of backup power (Apr-Jun 2026 quarter) |
| TD Power Systems | On-site power | Generators for the gas engines and gas turbines that power US data centres | Large repeat orders for US data centres; 93% of the ₹734.1 Cr of orders won in Apr-Jun 2026 came from abroad |
| MTAR Technologies | On-site power | Fuel-cell hot boxes for Bloom Energy, whose fuel cells power AI data centres; data-centre infrastructure assemblies | First data-centre infrastructure export order of ₹35.56 Cr (1 Apr 2026); Bloom work expected at about ₹560-600 Cr in FY27 (guidance of Aug 2025) |
| Quality Power | Grid equipment | High-voltage reactors that keep a large power supply stable | ₹48.3 Cr reactor order for a US data-centre project (Apr-Jun 2026 quarter) |
| HBL Engineering | Backup batteries | Nickel-cadmium and pure lead thin plate (PLT) batteries that start instantly | Data-centre sales doubled in FY26, with orders from STT, NTT, Colt, CapitaLand, Digital Edge, Reliance and CtrlS |
| KRN Heat Exchanger | Cooling | Fin-and-tube coils for the makers of data-centre chillers | Data-centre revenue of ₹116 Cr in Jul-Sep 2026, about 36% of revenue, against ₹18 Cr a year earlier |
| Aeroflex Industries | Liquid cooling | Stainless steel hoses and SFN skids, the piping frames of liquid cooling | Skid revenue of ₹32.4 Cr in Apr-Jun 2026, about 23% of revenue |
| Kilburn Engineering | Enclosures | Sheet-metal enclosures and cabinets for data-centre equipment makers, through Monga Strayfield | Data-centre equipment was 11% of new orders in Apr-Jun 2026 |
| HFCL | Connectivity | High-fibre-count optical cables and data-centre connectivity products | About ₹100 Cr of data-centre revenue in Apr-Jun 2026, the first quarter of the business |
For most of these companies, data centres are still a smaller part of revenue than their older businesses. At KRN Heat Exchanger, they were already about 36% of revenue in Jul-Sep 2026.
What a Data Centre Needs
A data centre is a building full of servers that must never stop. Its size is usually given in IT load, which means the power available to the servers themselves, not to cooling or lighting. The building as a whole needs more than that. If a site has 10 MW of IT load and a PUE (power usage effectiveness, total power divided by IT power) of 1.5, it needs 15 MW from the grid. A Tier III data centre built for air cooling costs about ₹50-55 Cr per MW in India.
That money goes into four things outside the servers:
- Power. A large data centre needs its own high-voltage substation, power transformers, switchgear and kilometres of cable. This is where Techno Electric, APAR and Quality Power sit, along with transformer makers such as CG Power and Hitachi Energy.
- Backup. A Tier III data centre is designed to be available 99.982% of the time, or about 1.6 hours of downtime a year. So it keeps rows of large gensets ready to start within seconds, and batteries that carry the load until they do. This is Kirloskar Oil Engines', Cummins' and HBL's market. In the US, some data centres that cannot wait for a grid connection build their own power plants, using gas engines, turbines or fuel cells, which is where TD Power and MTAR come in.
- Cooling. Cooling can take 10-30% of a data centre's power. Air cooling reaches its limit above about 15 kW per rack, and AI racks are expected to go above 30 kW, so new halls are moving to liquid cooling, where a coolant is piped right up to the chips. Chillers need coils from makers such as KRN, and liquid cooling needs pipes, hoses and skids from companies such as Aeroflex and Venus Pipes.
- Connectivity. Servers talk to each other and to users through fibre. AI data centres use cables with thousands of fibres each, which HFCL and STL make.
Why Data Centre Demand Is Rising in India
Capacity is growing fast. India's installed data-centre capacity rose from about 375 MW in 2020 to about 1.57 GW in August 2026, on the government's count. Property consultants count about 1.8 GW in operation in mid-2026, with nearly 3.9 GW more under construction or planned. The government projects close to 8 GW by 2030. Different sources measure capacity in different ways, so read each number with its basis.
The largest cloud companies are building here. Google plans to invest USD 15 bn over 2026-2030 in an AI hub at Visakhapatnam, with AdaniConneX and Airtel, and laid its foundation in April 2026. Microsoft has committed USD 17.5 bn over 2026-29 to cloud and AI infrastructure in India, and Amazon has raised its India investment for 2026-2030 to USD 48 bn. The government says investments of nearly USD 70 bn are already under way, with another USD 90 bn announced.
Policy helps. Data centres were given infrastructure status in the 2022-23 Budget, which makes long-term loans easier. The 2026-27 Budget gave a tax holiday until 2047 to eligible foreign cloud companies that serve global customers from data centres in India.
Power is the hard part. The Ministry of Power estimated in March 2026 that data-centre demand could reach 13.56 GW by 2031-32, and the Central Electricity Authority now puts it at 17 GW. That power has to be generated, carried and backed up, which is what most of the companies on this page sell.
The US market is even bigger. Data centres worldwide used about 415 TWh of electricity in 2024, about 1.5% of all electricity, and this is projected to reach about 945 TWh by 2030, with the US adding the most. That is why APAR, TD Power, MTAR and Quality Power have won data-centre orders from the US before most Indian ones.
Other Listed Companies in Data Centres
These companies also supply or run data centres but are not yet covered in our in-depth research. The details come from their own filings, calls and releases.
| Company | Where it sits | Data-centre work |
|---|---|---|
| Bharti Airtel (Nxtra) | Owner-operator | 14 large and 120+ edge data centres, with a design load of 159 MW at the large sites (FY26 annual report) |
| Adani Enterprises (AdaniConneX) | Owner-operator | 55+ MW live and 560+ MW tied up (FY26 annual report); partner in Google's Visakhapatnam AI hub |
| Reliance Industries | Owner-operator | Building a 168 MW data centre at Jamnagar for Meta, Meta's first in India (announced June 2026) |
| Anant Raj | Owner-operator | 28 MW of IT load in operation at Manesar and Panchkula (Apr-Jun 2026) |
| E2E Networks | GPU cloud | Rents out GPUs housed in data centres; about 5,100 GPUs live (Apr-Jun 2026) |
| CG Power | Transformers | About ₹900 Cr power-transformer export order for a US data-centre project (January 2026), its largest single transformer order |
| Hitachi Energy India | Transformers and substations | Commissioned a 220 kV gas-insulated substation for a data centre in Pune (Oct-Dec 2025 quarter) |
| Cummins India | Backup power | Data centres were 23% of its power-generation revenue in Apr-Jun 2026 |
| Blue Star | Cooling | Says it has about 30% of the market for data-centre mechanical, electrical and plumbing (MEP) projects (Apr-Jun 2026 call) |
| Venus Pipes & Tubes | Liquid cooling | ₹185 Cr letter of intent from a leading data centre for stainless pipe spools (Jan-Mar 2026 quarter) |
| Polycab India | Cables | Data centres, defence and EV charging together are about 4-5% of its cable demand (Apr-Jun 2026 call) |
| STL (Sterlite Technologies) | Connectivity | Enterprise and data centres were 19% of FY26 revenue |
| Black Box | Networking and integration | About 25% of its order book was data centres (Jan-Mar 2026 quarter) |
How to Read a Data Centre Stock
- Is there a real order, or only a plan? Many companies name data centres as a target before they win anything. Atlanta Electricals had no data-centre orders in its July 2026 order book, and Cyient DLM plans to enter AI data-centre hardware only between FY27 and FY29.
- What share of revenue is it? A large data-centre order can still be a small part of a big company. Look for the share of revenue or of the order book.
- India or the US? US data-centre demand is larger today, and several Indian suppliers get most of their data-centre orders from there. Indian orders depend on how fast hyperscale campuses here are built and leased.
- Supplier or owner? Suppliers are paid when they deliver. Owners such as Techno Electric spend large sums first and earn rent only as customers move in, so watch leasing as well as capacity.
- Who is the buyer? Many suppliers sell through one partner or one large customer, such as MTAR through Bloom Energy and Aeroflex through a global cooling company. That makes growth fast but concentrated.
Key Risks for Data Centre Stocks
- Guidance can change quickly: Techno Electric expected about ₹125 Cr of data-centre revenue for FY27 in November 2025, and cut that to ₹40-50 Cr in May 2026. Leasing at its Chennai campus has been gradual.
- Customer concentration: a single customer or partner, such as Bloom Energy for MTAR, can drive most of a company's data-centre business.
- Capacity numbers differ: the government counts about 1.57 GW of installed capacity, while the IEA counted about 2 GW in 2024 on a different basis. Projections of future demand vary even more.
- The cycle can turn: data-centre spending depends on cloud and AI spending by a handful of global companies. If they slow down, suppliers' orders slow too.
- Power and water limits: a data centre cannot open without a firm power connection, and new sites face rules on power, water use and energy efficiency.
Explore our Products
Research Framework
Emerging Titans
Combination of quantitative analysis, industry tailwinds, and management assessment - SPRINT investment philosophy
Tiny Titans
Heavy emphasis on scuttlebutt research, plant visits, and early on-ground signals
Conclusion
India's data-centre capacity has grown more than four times since 2020, and the largest cloud companies have announced tens of billions of dollars of new investment. That spending reaches Indian makers of cables, gensets, batteries, cooling parts and power equipment, and several of them are also winning orders from US data centres. But for most of them, data centres are still a young business, and plans do not always turn into orders. Use the tables above to see where each company sits, then read our research on each one for its orders, margins and risks.
FAQs
Which are the data centre stocks in India?
+Listed companies with a data-centre business include Techno Electric, APAR Industries, Kirloskar Oil Engines, TD Power Systems, MTAR Technologies, Quality Power, HBL Engineering, KRN Heat Exchanger, Aeroflex Industries, Kilburn Engineering and HFCL, along with operators such as Bharti Airtel, Adani Enterprises and Anant Raj. The tables on this page show what each one does.
How much data centre capacity does India have?
+India had about 1.57 GW of installed data-centre capacity in August 2026, up from about 375 MW in 2020, on the government's count. The government projects nearly 8 GW by 2030.
Which companies supply power equipment to data centres?
+Techno Electric builds substations, APAR makes cables, Quality Power makes reactors, CG Power and Hitachi Energy make transformers, Kirloskar Oil Engines and Cummins make backup gensets, and HBL makes backup batteries. TD Power and MTAR supply on-site power equipment for US data centres.
Which Indian companies make cooling products for data centres?
+KRN Heat Exchanger makes coils for data-centre chillers, Aeroflex Industries makes hoses and skids for liquid cooling, Venus Pipes & Tubes makes stainless pipe spools, and Blue Star builds data-centre cooling projects.
Which listed companies own data centres in India?
+Bharti Airtel (through Nxtra), Adani Enterprises (through AdaniConneX), Reliance Industries, Anant Raj and Techno Electric own and run data centres. Techno Electric's Chennai campus was redesigned to carry 35-40 MW of IT load.
What are the risks in data centre stocks?
+Data-centre plans can change quickly, many suppliers depend on one large customer, capacity numbers differ by source, and demand depends on spending by a few global cloud companies. For most suppliers, data centres are still a small part of revenue.
Explore our Products
Research Framework
Emerging Titans
Combination of quantitative analysis, industry tailwinds, and management assessment - SPRINT investment philosophy
Tiny Titans
Heavy emphasis on scuttlebutt research, plant visits, and early on-ground signals
Modern Warfare to Multibaggers
Key Trends. Strategic Shifts. Opportunities Ahead.
Don't Miss This Exclusive Webinar!
Join Value Educator to decode the key trends shaping India's defence sector and learn how to identify tomorrow's potential leaders in the space.
- In-depth research on India's defence sector
- Live Q&A session
- Actionable takeaways for long-term investors

No comments yet. Be the first to comment!