Data Centre Stocks in India 2026: Suppliers and Operators

By Shashank Mahajan
• 13th November, 2026 • 8 min read • 1 views
Data centre stocks in India 2026: suppliers and operators

In 2020, India had about 375 MW of data-centre power capacity. By August 2026, it had about 1.57 GW, more than four times as much, and India's Central Electricity Authority says data-centre power demand could reach 17 GW by 2031-32. Google has laid the foundation of a 1 GW AI data-centre hub at Visakhapatnam, and Meta has signed up for a 168 MW data centre that Reliance is building at Jamnagar.

Every one of those buildings needs a substation, transformers, cables, backup gensets, batteries, cooling and fibre before a single server is switched on. Many of these come from listed Indian companies, and some of them now sell the same equipment to data centres in the US. This page lists the companies we have studied in depth that have a real data-centre business, with each one's latest data-centre figure, and then other listed names in the chain. Each linked row leads to our full research on that company.

Figures as of 13 November 2026. This page is research, not a recommendation to buy or sell any stock.

Data Centre Stocks in India at a Glance

CompanyWhere it sitsWhat it supplies to data centresLatest data-centre figure (date)
Techno ElectricSubstations and owner-operatorBuilds substations, and builds and runs its own data centres in Chennai, Noida, Kolkata and at edge sites with RailTelChennai campus redesigned from 24 MW to 35-40 MW of IT load in the same buildings (Aug 2026); ₹628 Cr of data-centre capex so far
APAR IndustriesPower cablesMedium-voltage EPR cables for US data centres, and cables for Indian onesAbout ₹1,000 Cr of data-centre cable orders (Google in the US, Amazon in India) in a ₹3,012 Cr cable order book (Sep 2026)
Kirloskar Oil EnginesBackup powerLarge diesel gensets, including the twin-engine OptiprimeFirst hyperscale data-centre order, for about 192 MW of backup power (Apr-Jun 2026 quarter)
TD Power SystemsOn-site powerGenerators for the gas engines and gas turbines that power US data centresLarge repeat orders for US data centres; 93% of the ₹734.1 Cr of orders won in Apr-Jun 2026 came from abroad
MTAR TechnologiesOn-site powerFuel-cell hot boxes for Bloom Energy, whose fuel cells power AI data centres; data-centre infrastructure assembliesFirst data-centre infrastructure export order of ₹35.56 Cr (1 Apr 2026); Bloom work expected at about ₹560-600 Cr in FY27 (guidance of Aug 2025)
Quality PowerGrid equipmentHigh-voltage reactors that keep a large power supply stable₹48.3 Cr reactor order for a US data-centre project (Apr-Jun 2026 quarter)
HBL EngineeringBackup batteriesNickel-cadmium and pure lead thin plate (PLT) batteries that start instantlyData-centre sales doubled in FY26, with orders from STT, NTT, Colt, CapitaLand, Digital Edge, Reliance and CtrlS
KRN Heat ExchangerCoolingFin-and-tube coils for the makers of data-centre chillersData-centre revenue of ₹116 Cr in Jul-Sep 2026, about 36% of revenue, against ₹18 Cr a year earlier
Aeroflex IndustriesLiquid coolingStainless steel hoses and SFN skids, the piping frames of liquid coolingSkid revenue of ₹32.4 Cr in Apr-Jun 2026, about 23% of revenue
Kilburn EngineeringEnclosuresSheet-metal enclosures and cabinets for data-centre equipment makers, through Monga StrayfieldData-centre equipment was 11% of new orders in Apr-Jun 2026
HFCLConnectivityHigh-fibre-count optical cables and data-centre connectivity productsAbout ₹100 Cr of data-centre revenue in Apr-Jun 2026, the first quarter of the business

For most of these companies, data centres are still a smaller part of revenue than their older businesses. At KRN Heat Exchanger, they were already about 36% of revenue in Jul-Sep 2026.

What a Data Centre Needs

A data centre is a building full of servers that must never stop. Its size is usually given in IT load, which means the power available to the servers themselves, not to cooling or lighting. The building as a whole needs more than that. If a site has 10 MW of IT load and a PUE (power usage effectiveness, total power divided by IT power) of 1.5, it needs 15 MW from the grid. A Tier III data centre built for air cooling costs about ₹50-55 Cr per MW in India.

That money goes into four things outside the servers:

  1. Power. A large data centre needs its own high-voltage substation, power transformers, switchgear and kilometres of cable. This is where Techno Electric, APAR and Quality Power sit, along with transformer makers such as CG Power and Hitachi Energy.
  2. Backup. A Tier III data centre is designed to be available 99.982% of the time, or about 1.6 hours of downtime a year. So it keeps rows of large gensets ready to start within seconds, and batteries that carry the load until they do. This is Kirloskar Oil Engines', Cummins' and HBL's market. In the US, some data centres that cannot wait for a grid connection build their own power plants, using gas engines, turbines or fuel cells, which is where TD Power and MTAR come in.
  3. Cooling. Cooling can take 10-30% of a data centre's power. Air cooling reaches its limit above about 15 kW per rack, and AI racks are expected to go above 30 kW, so new halls are moving to liquid cooling, where a coolant is piped right up to the chips. Chillers need coils from makers such as KRN, and liquid cooling needs pipes, hoses and skids from companies such as Aeroflex and Venus Pipes.
  4. Connectivity. Servers talk to each other and to users through fibre. AI data centres use cables with thousands of fibres each, which HFCL and STL make.

Why Data Centre Demand Is Rising in India

Capacity is growing fast. India's installed data-centre capacity rose from about 375 MW in 2020 to about 1.57 GW in August 2026, on the government's count. Property consultants count about 1.8 GW in operation in mid-2026, with nearly 3.9 GW more under construction or planned. The government projects close to 8 GW by 2030. Different sources measure capacity in different ways, so read each number with its basis.

The largest cloud companies are building here. Google plans to invest USD 15 bn over 2026-2030 in an AI hub at Visakhapatnam, with AdaniConneX and Airtel, and laid its foundation in April 2026. Microsoft has committed USD 17.5 bn over 2026-29 to cloud and AI infrastructure in India, and Amazon has raised its India investment for 2026-2030 to USD 48 bn. The government says investments of nearly USD 70 bn are already under way, with another USD 90 bn announced.

Policy helps. Data centres were given infrastructure status in the 2022-23 Budget, which makes long-term loans easier. The 2026-27 Budget gave a tax holiday until 2047 to eligible foreign cloud companies that serve global customers from data centres in India.

Power is the hard part. The Ministry of Power estimated in March 2026 that data-centre demand could reach 13.56 GW by 2031-32, and the Central Electricity Authority now puts it at 17 GW. That power has to be generated, carried and backed up, which is what most of the companies on this page sell.

The US market is even bigger. Data centres worldwide used about 415 TWh of electricity in 2024, about 1.5% of all electricity, and this is projected to reach about 945 TWh by 2030, with the US adding the most. That is why APAR, TD Power, MTAR and Quality Power have won data-centre orders from the US before most Indian ones.

Be part of the
Value Educator
community

Get exclusive insights tailored to
sharpen your investment decisions.

Other Listed Companies in Data Centres

These companies also supply or run data centres but are not yet covered in our in-depth research. The details come from their own filings, calls and releases.

CompanyWhere it sitsData-centre work
Bharti Airtel (Nxtra)Owner-operator14 large and 120+ edge data centres, with a design load of 159 MW at the large sites (FY26 annual report)
Adani Enterprises (AdaniConneX)Owner-operator55+ MW live and 560+ MW tied up (FY26 annual report); partner in Google's Visakhapatnam AI hub
Reliance IndustriesOwner-operatorBuilding a 168 MW data centre at Jamnagar for Meta, Meta's first in India (announced June 2026)
Anant RajOwner-operator28 MW of IT load in operation at Manesar and Panchkula (Apr-Jun 2026)
E2E NetworksGPU cloudRents out GPUs housed in data centres; about 5,100 GPUs live (Apr-Jun 2026)
CG PowerTransformersAbout ₹900 Cr power-transformer export order for a US data-centre project (January 2026), its largest single transformer order
Hitachi Energy IndiaTransformers and substationsCommissioned a 220 kV gas-insulated substation for a data centre in Pune (Oct-Dec 2025 quarter)
Cummins IndiaBackup powerData centres were 23% of its power-generation revenue in Apr-Jun 2026
Blue StarCoolingSays it has about 30% of the market for data-centre mechanical, electrical and plumbing (MEP) projects (Apr-Jun 2026 call)
Venus Pipes & TubesLiquid cooling₹185 Cr letter of intent from a leading data centre for stainless pipe spools (Jan-Mar 2026 quarter)
Polycab IndiaCablesData centres, defence and EV charging together are about 4-5% of its cable demand (Apr-Jun 2026 call)
STL (Sterlite Technologies)ConnectivityEnterprise and data centres were 19% of FY26 revenue
Black BoxNetworking and integrationAbout 25% of its order book was data centres (Jan-Mar 2026 quarter)

How to Read a Data Centre Stock

  1. Is there a real order, or only a plan? Many companies name data centres as a target before they win anything. Atlanta Electricals had no data-centre orders in its July 2026 order book, and Cyient DLM plans to enter AI data-centre hardware only between FY27 and FY29.
  2. What share of revenue is it? A large data-centre order can still be a small part of a big company. Look for the share of revenue or of the order book.
  3. India or the US? US data-centre demand is larger today, and several Indian suppliers get most of their data-centre orders from there. Indian orders depend on how fast hyperscale campuses here are built and leased.
  4. Supplier or owner? Suppliers are paid when they deliver. Owners such as Techno Electric spend large sums first and earn rent only as customers move in, so watch leasing as well as capacity.
  5. Who is the buyer? Many suppliers sell through one partner or one large customer, such as MTAR through Bloom Energy and Aeroflex through a global cooling company. That makes growth fast but concentrated.

Key Risks for Data Centre Stocks

  • Guidance can change quickly: Techno Electric expected about ₹125 Cr of data-centre revenue for FY27 in November 2025, and cut that to ₹40-50 Cr in May 2026. Leasing at its Chennai campus has been gradual.
  • Customer concentration: a single customer or partner, such as Bloom Energy for MTAR, can drive most of a company's data-centre business.
  • Capacity numbers differ: the government counts about 1.57 GW of installed capacity, while the IEA counted about 2 GW in 2024 on a different basis. Projections of future demand vary even more.
  • The cycle can turn: data-centre spending depends on cloud and AI spending by a handful of global companies. If they slow down, suppliers' orders slow too.
  • Power and water limits: a data centre cannot open without a firm power connection, and new sites face rules on power, water use and energy efficiency.

Explore our Products

Research Framework

Market Cap focus
No. of ideas in a year
Holding period
Pricing
Product Image

Emerging Titans

Combination of quantitative analysis, industry tailwinds, and management assessment - SPRINT investment philosophy

Multi Cap
20-25
3+ Years
Rs. 23,999/year
Product Image

Tiny Titans

Heavy emphasis on scuttlebutt research, plant visits, and early on-ground signals

Exclusively for SME's
15-20
3+ years
Rs. 31,999/year

Conclusion

India's data-centre capacity has grown more than four times since 2020, and the largest cloud companies have announced tens of billions of dollars of new investment. That spending reaches Indian makers of cables, gensets, batteries, cooling parts and power equipment, and several of them are also winning orders from US data centres. But for most of them, data centres are still a young business, and plans do not always turn into orders. Use the tables above to see where each company sits, then read our research on each one for its orders, margins and risks.

FAQs

Which are the data centre stocks in India?

+

Listed companies with a data-centre business include Techno Electric, APAR Industries, Kirloskar Oil Engines, TD Power Systems, MTAR Technologies, Quality Power, HBL Engineering, KRN Heat Exchanger, Aeroflex Industries, Kilburn Engineering and HFCL, along with operators such as Bharti Airtel, Adani Enterprises and Anant Raj. The tables on this page show what each one does.

How much data centre capacity does India have?

+

India had about 1.57 GW of installed data-centre capacity in August 2026, up from about 375 MW in 2020, on the government's count. The government projects nearly 8 GW by 2030.

Which companies supply power equipment to data centres?

+

Techno Electric builds substations, APAR makes cables, Quality Power makes reactors, CG Power and Hitachi Energy make transformers, Kirloskar Oil Engines and Cummins make backup gensets, and HBL makes backup batteries. TD Power and MTAR supply on-site power equipment for US data centres.

Which Indian companies make cooling products for data centres?

+

KRN Heat Exchanger makes coils for data-centre chillers, Aeroflex Industries makes hoses and skids for liquid cooling, Venus Pipes & Tubes makes stainless pipe spools, and Blue Star builds data-centre cooling projects.

Which listed companies own data centres in India?

+

Bharti Airtel (through Nxtra), Adani Enterprises (through AdaniConneX), Reliance Industries, Anant Raj and Techno Electric own and run data centres. Techno Electric's Chennai campus was redesigned to carry 35-40 MW of IT load.

What are the risks in data centre stocks?

+

Data-centre plans can change quickly, many suppliers depend on one large customer, capacity numbers differ by source, and demand depends on spending by a few global cloud companies. For most suppliers, data centres are still a small part of revenue.

About the author
Shashank Mahajan
Shashank Mahajan

High growth stock specialist, Value Educator

Shashank Mahajan is an equity research professional with over 12 years of experience in identifying high-potential SME and micro-cap stocks at an early stage. He follows a rigorous scuttlebutt research–driven approach, combining on-ground insights with deep financial analysis. Shashank specializes in uncovering under-researched and under-owned companies with strong management quality and long-term growth potential. Through disciplined research and early identification, he focuses on spotting tomorrow’s market leaders before they enter the mainstream investor radar.

0 Likes 0 Comments
Share

No comments yet. Be the first to comment!

Explore our Products

Research Framework

Market Cap focus
No. of ideas in a year
Holding period
Pricing
Titan Image

Emerging Titans

Combination of quantitative analysis, industry tailwinds, and management assessment - SPRINT investment philosophy

Multi Cap
20-25
3+ Years
Rs. 23,999/year
Titan Image

Tiny Titans

Heavy emphasis on scuttlebutt research, plant visits, and early on-ground signals

Exclusively for SME's
15-20
3+ years
Rs. 31,999/year
Trending:
Product Offerings
Call Our Experts Call Our Experts

Call Us

Articles Icon Articles

Articles